1652354040663 A 0210 Atw Powerlink

Square D Powerlink G3 by Schneider Electric

Feb. 22, 2010
This intelligent lighting control system can be a critical cog in a demand-response strategy by dimming or turning off pre-selected lighting loads when necessary.

A Square D Powerlink G3 intelligent lighting control system can be a critical cog in a demand-response strategy by dimming or turning off pre-selected lighting loads when necessary, helping commercial building managers better control operating costs. Seamless to retrofit into an existing building and integrate within a building automation system, a Square D Powerlink G3 intelligent lighting control system can quickly react to potential load-shed situations, such as market electrical prices reaching a pre-determined ceiling that prompts a shift to back-up power sources. A Square D Powerlink G3 intelligent lighting control system also can be used to configure and execute a load-shed sequence remotely, increasing convenience for facility managers.

Square D Powerlink G3 intelligent lighting control panelboards contain a schedule-based controller that can be configured to include a load-shed lighting sequence that activates based on a command from the building automation system, facility manager, or even directly from the utility.

Sponsored Recommendations

Voice your opinion!

To join the conversation, and become an exclusive member of I+S Design, create an account today!